Loading page content
Loading page content
Quality and logistics
The system of checkpoints that catches problems at the stage that caused them.

Quality assurance is not a final inspection. By the time a garment reaches final inspection, every decision that determines its quality has already been made, and the only remaining options are acceptance or rework.
The checkpoints described here run from incoming material through to packing. Each one exists to catch a specific class of problem at the point where correction is still cheap.
Process
Each stage exists to resolve one question. Skipping a stage moves risk further down the line rather than removing it.
Fabric and trims are checked against specification before cutting.
The approved sample, tech pack and materials are reviewed together before the line starts.
Defined operations are checked during production.
Garments are measured against the chart and its tolerances.
Finished goods are inspected against the agreed sampling standard.
Cartons are checked for assortment, labelling and quantity before shipping.
Suitability
Where this capability is the right choice, and the materials it is compatible with.
Limits
Stated plainly, because a capability described without its constraints will be misapplied to a product it does not suit.
Materials
Composition, weight guidance and decoration behaviour for each fabric are on its own page.
Questions
AQL is a statistical sampling method used to decide whether to accept or reject a production lot based on an inspected sample rather than every unit. The inspection level and acceptance limits are commercial decisions that vary by buyer and product. We agree the standard for your order in writing rather than assuming one.
Yes. Third party inspection and buyer appointed quality agents are welcome. Tell us the inspection standard and the sampling plan you intend to apply so that the schedule allows time for inspection and, if needed, for rework before shipping.
An approved pre production sample and the signed specification become the reference for repeat orders. Reorders are checked against that reference rather than reinterpreted, which is what keeps a second run consistent with the first. Where a fabric or trim has changed availability, we tell you before production instead of substituting quietly.




Tell us the product, the fabric and the quantity. We will confirm whether this is the right process and what it means for your minimum quantity and schedule.